PolyLevel (R) in Torrance
![](https://cdn.treehouseinternetgroup.com/uploads/photo_gallery/medium/187327-5b2be1ac37519_e12fdcc3-6dab-4901-a246-b14653b6244d.jpg?v=)
This Picture shows a walkway that was a trip hazard.Settling soils under the walkway had caused one of the concrete slabs to sink. Saber used PolyLevel Injection to fill the void, and lift the slab. The trip[ hazard was eliminated. Notice the filled in holes in the concrete. This is where Saber drilled holes through the concrete and into the void.