Foundation Piers in Santa Ana
This picture shows a key step that has to occur before Foundation Piers are attached to the base of a Foundation to strenthen it. First the top Of the Foundation must be made flush with the base of the Foundation. Our crew drills holes through the over poured concrete at the base. Then they break off the excess concrete and remove the debris. Now the Foundation is ready for the Pier to be attached.