Supporting a Brand New Irrigation Canal Bridge in Wasco
On this job, Saber was a Sub Contractor. The Bridges crossing the irrigation canals were failing. A trench was dug. Saber Drove Helical Piers into the ground and adjusted them to a high torque. Then plates were attached to the top of these piers. The right side of the picture shows 3 installed Piers. Other contractors will finish this job. This bridge will be solid for several years to come.