There are several cracks, that are now Trip Hazards in a concrete warehouse floor. Several Voids have formed, and are expanding, due to Shifting Soils. Saber Drilled 23 Holes through the Concrete slabs and into the Voids. We then filled all of these voids with Polyurethane, by using our State-of-the-Art PolyLevel Injection Process. All of the low spots, on the floor, were lifted back to a Consistant Elevation. The cracks are no longer expanding, and all Trip Hazards have been eliminated.PolyLevel(R) Repairs a Warehouse Floor in Vista
Challenge
Solution
Case Studies
Friday, September 21st, 2018 by Dave Weekley
View Photo Gallery
our service area
We serve the following areas
- Amboy
- Baker
- Bard
- Blythe
- Brawley
- Calexico
- Calipatria
- Cathedral City
- Cima
- Coachella
- Daggett
- Desert Center
- Desert Hot Springs
- Earp
- El Centro
- Essex
- Fort Irwin
- Heber
- Holtville
- Imperial
- Indian Wells
- Indio
- Joshua Tree
- La Quinta
- Landers
- Ludlow
- Mecca
- Morongo Valley
- Mountain Pass
- Needles
- Newberry Springs
- Niland
- Nipton
- North Palm Springs
- Palm Desert
- Palo Verde
- Parker Dam
- Pioneertown
- Rancho Mirage
- Salton City
- Seeley
- Thermal
- Thousand Palms
- Trona
- Twentynine Palms
- Vidal
- Westmorland
- Winterhaven
- Yermo
- Yucca Valley