Case Studies

PolyLevel(R) Eliminates Trip Hazards in Escondido

View Photo Gallery

Challenge

Voids under a Pool Deck have created cracked concrete and Trip Hazards. Parts of the Deck are sinking.

Solution

Saber used their State-of-the-Art PolyLevel Injection Process to fill the Voids with Polyurethane. This Lifted the Sinking Concreate, and stopped the Void from Expanding.

our service area

We serve the following areas

Our Locations:

Saber
7301 Madison St
Paramount, CA 90723
1-951-797-7754


Saber
1320 Distribution Way Suite B
Vista, CA 92081
1-760-300-1526
Saber Foundation Repair Service Area