APPENDIX 2F
MODEL SPECIFICATIONS
Chapter 2
Helical Foundation Systems
15.2.3 Name of third party test agency and personnel present during load testing, if any.
15.2.4 Date, time, duration and type of the load test.
15.2.5 Unique test identifier and map showing the test anchor location.
15.2.6 Anchor model and installation information including shaft type, helix configuration, lead
and extension section quantities and lengths, final anchor tip depth, installation date,
total test anchor length and final termination torque.
15.2.7 Calibration records for applicable anchor installation and test equipment.
15.2.8 Tabulated test results including cumulative anchor head movement, loading increments
and hold times.
15.2.9 Plots showing load versus anchor head movement for each loading/unloading interval.
16
CLEANUP
16.1 Within one week of completion of the work, the Installing Contractor shall remove any and all
material, equipment, tools, debris or other items belonging to the Installing Contractor or used
under the Installing Contractor’s direction.