          CLEANUP
        
        
          10.1 With one week of completion of the work, the Installing Contractor shall remove any and all
        
        
          material, equipment, tools, debris, of other items belonging to the Installing Contractor or used
        
        
          under the Installing Contractor’s direction.
        
        
          
            11
          
        
        
          METHOD OF MEASUREMENT
        
        
          11.1 The high-density polyurethane material shall be measured by the pound. Weight of the injected
        
        
          material will be recorded and documented at each location and at the end of each work shift.